    FAQ of Aerated autoclaved concrete block production(1)

    Author : RuiGuang    Time : 2013-11-26    Click :
    Q:1. Due to the high cost of Fly Ash  We compelled to use ground (crushed) Sand: 
    a. Can we replace 100% fly ash by Sand
     
    A: 100% yes
     
    Q:b. Do we have to use separate ball mill for sand grinding (instead of Lime grinding ball mill) – What are the specification for sand grinding ball mill & cost? 
     
    A:  Yes,two separate ball mills are necessary for sand grinding and lime griding .
                            Φ900x3000 for  lime and Φ1200x4500 for sand.
     
    Q:c.   What are the rated output capacity of ball mill for lime and sand grinding? 
    A:
    Model Ball capacity
    (t)
    Feeding
    Siz(mm)
    Discharging 
    Size
    (mm)
    Capacity
    (t/h)
    Motor
    (kw)
    Weight
    (kg)
    Φ900x3000
    (dry type)
       2.5 ≤20 0.075-0.89  1.2    22    11.5
    Φ1200x4500
    (wet type)
       7 ≤25 0.074-0.4    5    55     13.8
     
     

    Q:2. For conversion of CaCO3 (Limestone) to CaO (Lime) if we are using incinerator / Kiln 
    a. What is the efficiency of conversion process?
     
    A:Generally speaking,1Mt CaCO3 can make 400kg-600kg CaO.
     
    Q:b. What is the rate of fuel consumption (Coal) by Kiln (for 1Mt of Lime)
     
    A:For 1 Mt lime we need 180kg-200kg coal as heating source ,the coal consumption also depends on the heating value,normally the coal heating value should be no lower than 4500 kcal.
                       My question:If you are willing to set up this plant with capacity 100m3/day and not   intend to expand the capacity in short time,it’s better and cost-efficient to buy the finished quicklime product rather than setting your own quicklime production plant.Unless you can get the limestone for free.
                        Simple caculation:1m3 AAC block  production cost 130kg lime.
    Whole year capacity 35,000 m3 cost 35,000x0.13=4550 Mt,please refer the quicklime and lime stone price in your local market and find out if my suggestion is available.
    Q:3. Ball mill re-charging
    a. What is the usual rate of recharge of lime and sand grinding ball mills? 
     
    A:Normally the filling ratio of the ball mill is between 30%-40%.For the ball load,we can calculate by the formulation:
    Q=π/4D2.L.φ.γ
    1.D stands for inner diameter of the ball mill
    2.L stands for ball mill length
    3.φ stands for ball filling ratio
    4.γ  stands for ball density

     
    Q:4. Autoclave process
    a. What is the fuel (coal) consumption rate of autoclave per 1M3 of AAC block.
     
    A:We need 2 T automatic furnace for the autoclave and the consumption is 1.5 ton per day.
     
    Q:5. Estimated Man power for proposed plant
    a. Machine operators
    b. Direct Labor
     
    A:10 people/shift,20 workers for 2 shifts in total.
     